The Venue
Project
The Venue at Cribbs Causeway, one of the South West’s largest and most popular entertainment destinations required 10,600msq of replacement roofing that had deteriorated over time, causing water to ingress to the numerous hospitality establishments below.
How we helped
As principal contractors and with an established supply chain, we assessed the roof to enact immediate temporary repairs. The roof refurbishment was executed in four planned phases to minimise disruption to the live building and ensure continuous protection for all the occupants and public. Additional works included plant relocation, replacement and additional safety rooftop protection for compliance and ease of future maintenance.
Planning and execution were heavily required to mitigate the unforeseen weather changes and provide the client’s hospitality tenants with zero disruption or public impact.
The results
We and our partners delivered the scheme with discretion, completed over 8 months within time and on budget. Selecting Alumsac Olivine Derbigum as a roofing fabric means The Venue now benefits from a 35 year guaranteed product, Olivine reacts with Co2 in the atmosphere , helping to capture and neutralise carbon dioxide. In this case the project has achieved a environmental benefit equivalent to reducing 132.114km of diesel emission.
Timescale
32 Weeks
Value
£1,300,000
Location
Cribbs Causeway
Client
M&G
REFURBISHMENT/FIT OUT
- Stripping of existing facade and replacing with new rain screen trespa cladding, windows and signage.
- Overcladding of existing roof.
- Creation of a new entrance lobby.
- Overlay of existing roof to changing room facility.
- Re-configuration of changing room facility and general refurbishment works including new sanitary and shower appliances, new flooring, lighting and M&E systems.
- Full refurbishment of main hall and gymnasium areas.
COST MANAGEMENT
PROJECT MANAGEMENT
WORKING IN LIVE ENVIRONMENTS
DIRECTLY EMPLOYED TRADES PEOPLE
CLIENT REQUIREMENTS
SCOPE OF WORK
HOW WE HELPED
THE RESULTS
CLIENT REQUIREMENTS
SCOPE OF WORK
- Tracing and isolating live services
- Systematically demolishing the building
- Relaying a new surface on the old footprint
- Removal of existing glass canopy
- Replacement glazing
- Revitalise curtain wall framework
- Decorations.